Download Tokopedia App
Tentang TokopediaMulai Berjualan PromoTokopedia Care
tokopedia-logo
Atur jumlah dan catatan

Stok Total: Sisa 5

Subtotal

Rp31.988.000

ESAB | Buddy Arc 630i MMA MMA Welding With Long Lead and Arc Gouging

Rp31.988.000
  • Kondisi: Baru
  • Min. Pemesanan: 1 Buah
  • Etalase: Semua Etalase
Buddy Arc 630i
MMA Welding with Long Lead and Arc Gouging

Rugged and Versatile
Buddy Arc 630i is heavy duty IGBT based inverter power
source suitable for MMA welding, Air Carbon Arc
Gouging (A-CAG), Scratch TIG and designed for
24x7 usage.

* Stable performance with long leads in MMA with
E6013 and E7018 electrodes
* Wide operating window: 20 to 630A
* Wide mains voltage tolerance: 400V -15% ... +20%
* User-friendly controls: adjustable arc force & hot start
in MMA mode and process selection switch for MMA /
Scratch TIG
* In-built protections – mains over/under-voltage & overheating

Application Areas
* Heavy fabrication
* Construction and erection projects
* Cement plants
* Process plants
* Repair and maintenance

Specifications :
Technical Data :
Model : Buddy Arc 630i
Mains voltage, V/Ph, Hz : 400 -15% ... +20% / 3, 50 / 60
Effective input current, A : 53
Open circuit voltage, V (without VRD) : 85
Open circuit voltage, V (VRD activated) : < 20
Output current range, A : 20 – 630
Maximum load at 60% duty cycle, A : 630
Maximum load at 100% duty cycle, A : 490
Power factor at full load : 0.89
Efficiency (max) : 85%
Dimensions, l x w x h, mm : 650 x 355 x 624
Weight, Kg : 59
Operating temperature, deg C : -10 to +40
Application class : S
Standards of conformity : EN 60974-1 & EN 60974-10

SEBELUM MELAKUKAN PEMESANAN, MOHON UNTUK BERTANYA TERLEBIH DAHULU MELALUI CHAT SEBAB BARANG YANG DIPESAN TIDAK DAPAT DI TUKAR / DI RETUR.
SEBELUM MEMBERI ULASAN, BIJAKLAH DALAM MEMBERI PENILAIAN / MEMBERI BINTANG!!!

Ada masalah dengan produk ini?

ULASAN PEMBELI

Toped Illustration

Belum ada ulasan untuk produk ini

Beli produk ini dan jadilah yang pertama memberikan ulasan