Terdiri dari bracket, karet, washer, bushing, manual instruction (Kabel di jual terpisah)
Note: Install times, does not take in account removing fairing/windshield or re installing. If your bike is factory, its about 35 minutes total.
MATERIAL: Main Set is 2 Layers of .10 Thick Steel. Front Filler Plate is 18G. Steel Stainless Hardware Provided All Primed and Gloss Black Powder Coated Parts.
INSTALL TOOLS REQUIRED: 3/16 Allen Wrench (T-handle preferred) 5mm Allen Wrench (T-handle preferred) T-30 Torx Driver T-25 Torx Driver #2 Phillips Screw Driver 7/16 Wrench / Socket Blue Loctite (Or Equal) Do not use Red